Welcome Dr. Shichang Xiao from Shanghai Maritime University to be committee member!

日期:12/20/2018 点击量:  503次


Dr. Shichang Xiao, Shanghai Maritime University, China (click)


Research Area:

Industrial engineering; Intelligent manufacturing; Production scheduling; Intelligence optimization algorithms


Research Experience:

EDUCATION

Ph.D. (2012-2018): Northwestern Polytechnical University (NWPU), Xi’an, China;                           

Joint Ph.D. (2015-2016): University of Michigan (UM), Ann Arbor, Michigan, USA;

Master (2009-2012): Xi’an University of Technology;

Bachelor (2005-2009): Henan University of Technology.

 

RESEARCH PROJECT

2018/07-2018/09: “Research on advanced planning and scheduling module of intelligent manufacturing workshop”. Visiting scholar of Wujiang Economic and Technological Development Zone. (Suzhou, China).

2017/01-2018/06: “Programmable cluster robot autonomous robust formation”. NSFC (No. 51775435), ¥680,000. (NWPU, China)

2015/10–2016/05: Robustness optimization and process quality control for Job shop scheduling with uncertain processing times, China Scholarship Council (No. 201506290157), $ 26,400. (UM, USA).

2014/01-2015/10, “The risk aggregation mechanism and modeling analysis of Job shop scheduling”, NSFC (No. 51475383), ¥800,000. (NWPU, China)

2012/03-2013/12, “Research on adaptive job shop scheduling under uncertainties”, NSFC (No. 51075337), ¥380,000. (NWPU, China)

2010/10-2011/10, “Research on automatic printing precision measurement of Screen Printing by computer vision based noncontact-measurement”, Financed by Education Department of Shaanxi, ¥35,000. (XAUT, China)


Academic activities

Institute of Industrial & System Engineers (IISE): membership.

Institute for Operations Research and Management Science (INFORMS): membership.

Shanghai overseas returned scholars association (SORSA): membership.

Reviewer of international journals: Computers and Industrial Engineering, IEEE ACCESS.

Reviewer of International Federation of Automatic Control: IFAC World Congress 2016, IFAC MIM 2019.


PUBLICATIONS

[1]. Shichang Xiao, Shudong Sun, Judy Jin. (2016). Robust optimization for improving the robustness of stochastic job shop scheduling problems by using surrogate measures. Energies 2017, 10, 543. (SCI, IF 2.262) 

[2]. Zigao Wu, Shudong Sun, Shichang Xiao. Risk Evaluation of Job Shop Scheduling with Random Machine Breakdowns. Computers & Operational Research, 2018. (SCI, IF 2.90)

[3]. Shichang Xiao, Shudong Sun, et al. (2015). Hybrid Estimation of Distribution Algorithm for Solving the Stochastic Job Shop Scheduling Problem. Journal of Mechanical Engineering, 51(20), 27-35. (EI: 20155101700319) (In Chinese)

[4]. Shichang Xiao, Shudong Sun, Hong’an Yang. (2015). A hybrid Estimation of distribution algorithm for stochastic job shop scheduling with Earliness/Tardiness penalty. Control and decision, 30(10): 1854-1860. (EI: 20154501526099) (In Chinese)

[5]. Shichang Xiao, Shudong Sun. (2014). Proactive Scheduling Research on Job Shop with Stochastically Controllable Processing Times. Journal of Northwestern Polytechnical University, 32(6): 929-936. (EI: 20150400441084) (In Chinese)

[6]. Shichang Xiao, Shudong Sun, Yingfeng Zhang, Hongan Yang (2013). Two-stage hierarchical strategies based Stochastic Job Shop scheduling with random processing times. The 43rd International Conference on Computers and Industrial Engineering, October 16-18. University of Hong Kong, Hong Kong, China. (EI: 20141717626608)

[7]. Shichang Xiao, Shudong Sun, Huan Guo. (2014). Cataclysm Genetic algorithm for solving Vehicle Scheduling problem with time windows. Application Research of Computers. 31(12): 3568-3571. (In Chinese)

[8]. Duo Li, Shudong Sun, Shichang Xiao (2013). The fuzzy rule-based Predictive-reactive schedule under uncertainties. Application Research of Computers, 31(5): 1418-1423.

 


Supported by

Media Support

Indexing Information

Official Wechat